Repository logo
Log In(current)
  1. Home
  2. Theses and Dissertations
  3. Engineering
  4. Crafts skills gaps in the construction industry in Zambia
Details

Crafts skills gaps in the construction industry in Zambia

Date Issued
2016
Author(s)
Kaoma, Chanda Charles
Abstract
The construction industry in Zambia grew rapidly in the period between 2005 and 2015. The growth in infrastructure development resulted in a construction boom. The boom had catalysed increased demand for construction artisans. Hiring artisans with the right skills and experience has been an ongoing challenge. Contractors need skilled artisans to effectively deliver projects of high quality. A model that enhances effective artisan skills supply to the Zambian construction industry was developed after establishing factors that lead to skills shortages and how that contributes to construction defects and low productivity. Apprenticeship training was considered and evaluated as a mitigation pathway for construction crafts skills gaps.
Interviews, questionnaire survey and three case studies were used to collect data. The study established skills shortages in Zambia’s construction sector. The identified crafts shortages were among tilers, shop fitters, air-conditioners technicians, and plasterers, building foremen, carpenters, painters, plumbers, bricklayers, electricians, steel fixers and steel fabricators. Identified causes of skills shortages included: lack of co-ordination between industry and trade schools, low number of trade schools, un-attractive conditions of service. The impact of skills shortages were poor workmanship, low efficiency and reduced effectiveness of industry workforce.
Apprenticeship Skills Flow Chart Model (ASFM) was developed and apprenticeship has been recommended as a possible approach to alleviating skills shortages. The proposed model recommends duration of 2 years minimum for apprenticeship training where apprentices should learn 20 percent theory on important construction topics. The implementation of ASFM could lead to more quality artisan labour in the industry and better productivity improvements in project delivery. Future research should be extended to road construction and manufacturing industry of construction related materials.
Subjects

Occupational training...

Apprenticeship traini...

File(s)
Loading...
Thumbnail Image
Name

Main Document.pdf

Size

1.09 MB

Format

Adobe PDF

Checksum

(MD5):6460d5ffa39936cd1987a8e1877bfc7a

Built with DSpace-CRIS software - Extension maintained and optimized by 4Science

  • Accessibility settings
  • Privacy policy
  • End User Agreement
  • Library Services
Repository logo COAR Notify